• Cobalt Metal 99.8%min Delivered Chinaup(7)  06-25|Selenium Dioxide 98%min Delivered Chinadown(-3)  06-25|Cobalt Metal 99.8%min In warehouse Rotterdamup(0.4)  06-25|Ethylene Glycol Antimony 57%min Delivered Chinadown(-4000)  06-25|Rutile Conc TiO2 95%min EXW Chinadown(-200)  06-25|Yttrium Oxide 99.999%min FOB Chinaup(0.2)  06-25|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  06-25|Silicon Metal 5-5-3 In port Indiadown(-3)  06-25|Antimony Trioxide 99.5%min Delivered Chinadown(-4000)  06-25|Cobalt Powder 99.5%min Delivered Chinaup(6)  06-25|Silicon Metal 4-4-1 In port Indiadown(-3)  06-25|Chrome Conc. 40%min FOB S.A. down(-5)  06-25|Vanadium Pentoxide Powder 99.5%min EXW Chinadown(-2000)  06-25|Cobalt Metal 99.8%min In warehouse Baltimoreup(0.4)  06-25
  • Huodu New Material starts phase I production at prebaked anode project

    2025-06-20 14:29:43   [Print]
    On June 19, Inner Mongolia Huodu New Material Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright With a total investment of RMB1.Asian Metal Copyright began production at the calcination workshop of its Phase I prebaked anode project, marking a key milestone.Asian Metal Copyright2 billion USD168 million, the project is jointly invested by Qinyang Dushi Group and Holingol Urban Development Group, and is located in the High-Tech Zone's aluminum materials park.Asian Metal Copyright The project has a total planned capacity of 600,000 tonnes per year, with Phase I accounting for 300,000 tonnes.

    With a total investment of RMB1.2 billion (USD168 million), the project is jointly invested by Qinyang Dushi Group and Holingol Urban Development Group, and is located in the High-Tech Zone's aluminum materials park.

    Phase I began construction in August 2024 and is expected to generate RMB1.5 billion (USD209 million) in annual output, RMB100 million (USD13.Asian Metal Copyright The project has a total planned capacity of 600,000 tonnes per year, with Phase I accounting for 300,000 tonnes.Asian Metal Copyright93 million) in tax revenue, and create around 500 jobs.Asian Metal Copyright2 billion USD168 million, the project is jointly invested by Qinyang Dushi Group and Holingol Urban Development Group, and is located in the High-Tech Zone's aluminum materials park.Asian Metal Copyright The project will help ease the local shortage of carbon materials for aluminum production and support the city's goal of becoming a "Green Aluminum Hub".

    Dushi Group aims to bring Phase II into operation in October and November, targeting full capacity of 600,000tpa by the end of this year, with future phases already in planning to align with a 1-million-tonne-per-annum primary aluminum project.

    .Asian Metal Copyright With a total investment of RMB1Asian Metal Copyright
    Prebaked Anode S 3%max FOB China
    Unit:USD/mt
    Prebaked Anode S 3%max FOB China USD/mt
    China non-commercial prebaked anode producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.