• Polysilicon 9N Delivered Chinaup(1)  07-03|Chrome Lump S.A. 38%min CIF Chinadown(-6)  07-03|Zircon Sand S.A. Zr(Hf)O2 65%min CIF Chinadown(-30)  07-03|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.3)  07-03|Calcium Ingot Reductive 98%min EXW Chinaup(350)  07-03|Iron Ore Fine Australian 62%min CNF Chinaup(2)  07-03|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(10)  07-03|HR Coil SS400 3.0mm In warehouse Kuala Lumpurdown(-50)  07-03|Ferro-vanadium 80%min In warehouse Rotterdamdown(-0.5)  07-03|Medium Plate SS400 16mm In warehouse Kuala Lumpurdown(-50)  07-03|Spodumene Li2O 5%min In port Chinaup(15)  07-03|Zircon Sand S.A. Zr(Hf)O2 66%min CIF Chinadown(-30)  07-03|Zircon Sand Australian Zr(Hf)O2 66%min In port Chinadown(-30)  07-03|Fused Zirconia Zr(Hf)O2 98.5%min EXW Chinaup(500)  07-03
  • AsianMetal
    Events & Holidays
    event

    Monthly Section Steel and Steel Pipe Market Report Jan 2025

    2025-02-12 11:53:54   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    1. Market Highlights

    The domestic section steel and steel pipe market performed inactively during the month. The demand from downstream industries shrank further with more and more construction projects halted production either due to the cold weather or the approach of the Spring Festival holiday.Asian Metal Copyright The demand from downstream industries shrank further with more and more construction projects halted production either due to the cold weather or the approach of the Spring Festival holiday.Asian Metal Copyright The market inventory fluctuated at the low level as steel mills cut production and traders kept cautious about supplementing inventories.

    .Asian Metal Copyright1Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.