• Met. Coke A 13%max, S 0.7%max EXW Shanxiup(50)  07-17|Met. Coke A 13%max, S 0.7%max EXW Hebeiup(50)  07-17|Met. Coke A 13%max, S 0.7%max EXW Shandongup(50)  07-17|Tungsten Ore WO3 50%min FOB Africaup(10)  07-17|Rhenium APR 99.99%min EXW Chinaup(250)  07-17|Lanthanum Oxide 99.999%min FOB Chinaup(0.07)  07-17|Molybdenum Scrap Cutting 99.95%min Ex-VAT EXW Chinadown(-10)  07-17|Lanthanum Oxide 99.999%min EXW Chinaup(500)  07-17|Praseodymium Oxide 99.5%min FOB Chinaup(1700)  07-17|Tellurium Metal 99.99%min EXW Chinadown(-15)  07-17|Iron Ore Fine Brazilian 65%min In port Chinaup(20)  07-17|Neodymium Oxide 99.5%min FOB Chinaup(1500)  07-17|Chrome Lump S.A. 38%min In port Chinaup(1)  07-17|Iron Ore Fine Australian 58%min In port Chinaup(15)  07-17
  • Construction kicks off for rare earth permanent magnet motor project in Baotou

    2024-03-26 11:56:32   [Print]
    Construction has kicked off for the rare earth permanent magnet motor industrial park project in Baotou Rare Earth High-Tech Industrial Development Zone.Asian Metal Copyright The project is broken ground by Baotou Binhe New Town Development Construction Co.Asian Metal Copyright The project is broken ground by Baotou Binhe New Town Development & Construction Co.Asian Metal Copyright .Asian Metal Copyright, Ltd.Asian Metal Copyright18 million, the project is scheduled to begin equipment installation on June 30 and complete construction and pass acceptance check on November 30, 2024.Asian Metal Copyright and has a planned land area of 76,852 square meters and a floor area of 72,138 square meters.Asian Metal Copyright and has a planned land area of 76,852 square meters and a floor area of 72,138 square meters.Asian Metal Copyright With total investment estimated at RMB290 million (USD40.Asian Metal CopyrightConstruction has kicked off for the rare earth permanent magnet motor industrial park project in Baotou Rare Earth High-Tech Industrial Development Zone.Asian Metal Copyright18 million), the project is scheduled to begin equipment installation on June 30 and complete construction and pass acceptance check on November 30, 2024.

    .Asian Metal Copyright18 million, the project is scheduled to begin equipment installation on June 30 and complete construction and pass acceptance check on November 30, 2024Asian Metal Copyright
    PrNd Mischmetal Pr 25%, Nd 75% EXW China
    Unit:RMB/mt
    PrNd Mischmetal Pr 25%, Nd 75% EXW China RMB/mt
    China's praseodymium-neodymium oxide producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.