• Silicon Metal 4-4-1 Ex-VAT FOB Chinadown(-40)  04-23|Terbium Metal 99.9%min EXW Chinadown(-250)  04-23|Terbium Oxide 99.99%min EXW Chinadown(-200)  04-23|Silicon Metal 4-4-1 FOB Chinadown(-40)  04-23|Yttrium Oxide 99.999%min EXW Chinadown(-1500)  04-23|Cobalt Carbonate 46%min Delivered Chinaup(3000)  04-23|Coal Tar Pitch Coking Value 53%min EXW Chinadown(-120)  04-23|Lead Scrap Recycled Start-type Battery Ex-VAT Delivered Chinaup(250)  04-23|Cerium Oxide 99.9%min EXW Chinadown(-300)  04-23|Lead Scrap Recycled Deep Cycle Battery Ex-VAT Delivered Chinaup(250)  04-23|Bismuth Ingot 99.99%min Delivered Europeup(0.3)  04-23|Bismuth Ingot 99.99%min Delivered USup(0.3)  04-23|Cobalt Oxide 72%min In warehouse Rotterdamup(0.5)  04-23|Silicon Metal 7-8-3 Ex-VAT FOB Chinadown(-30)  04-23
  • CMOC's KFM mine produces over 14kt of copper in Jan

    2024-02-19 12:00:42   [Print]
    CMOC's KFM mine in DRC completed 109% of its production guidance for January 2024 with copper production exceeding 14,000 tonnes.Asian Metal Copyright 2024 marks the second year of operation at KFM mine.Asian Metal Copyright 2024 marks the second year of operation at KFM mine.

    .Asian Metal CopyrightCMOC's KFM mine in DRC completed 109% of its production guidance for January 2024 with copper production exceeding 14,000 tonnesAsian Metal Copyright
    Copper Conc. 20%min Delivered China
    Unit:RMB/mt Cu
    Copper Conc. 20%min Delivered China RMB/mt Cu
    China copper concentrate producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.