• Antimony Trioxide 99.5%min In warehouse Rotterdamup(1.4)  04-30|Silicon Powder 99%min Delivered Chinadown(-300)  04-30|Spodumene Li2O 5%min In port Chinadown(-30)  04-30|LNCMO 523 PC Delivered Chinadown(-3)  04-30|Reduced Ilmenite TiO2 56%min EXW Chinadown(-100)  04-30|LNCMO 523 SC Delivered Chinadown(-3)  04-30|Silicon Metal 5-5-3 Ex-VAT FOB Chinadown(-30)  04-30|Ferro-titanium 70%min Delivered USdown(-0.2)  04-30|Silicon Metal 5-5-3 FOB Chinadown(-30)  04-30|Yttrium Oxide 99.999%min In warehouse Rotterdamup(0.2)  04-30|Yttrium Oxide 99.999%min EXW Chinadown(-1000)  04-30|HR Coil SS400 3.0mm In warehouse Kuala Lumpurup(50)  04-30|Molybdenum Scrap Wire 99.95%min Ex-VAT EXW Chinaup(6)  04-30|Sodium Tungstate WO3 68%min EXW Chinaup(3000)  04-30
  • AsianMetal
    Events & Holidays
    event

    Monthly Section Steel and Steel Pipe Market Report Jul 2023

    2023-08-11 14:33:16   【Print】
    The following is a brief synopsis of the report. Your access is restricted as it is a subscription based service.
    Please contact us for a subscription.
    1. Market Highlights

    The domestic section steel and steel pipe market failed to improve during the month as the high temperature and continuous rains restrained the downstream demand from improving. Meanwhile, reporting capital shortage, lots of downstream projects did not operate smoothly.Asian Metal Copyright Meanwhile, reporting capital shortage, lots of downstream projects did not operate smoothly.Asian Metal Copyright Upon the frequent price fluctuations, end users strictly purchased according to orders for final products.Asian Metal Copyright .Asian Metal Copyright Nevertheless, supported by the high production costs as well as the positive anticipation for the market prospect, steel mills kept eager to raise prices.

    .Asian Metal Copyright Meanwhile, reporting capital shortage, lots of downstream projects did not operate smoothlyAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.