800MW plateau wind power base with largest installed capacity in China goes into full operation
2023-05-08 11:55:49
[Print]
On May 8, the 135 wind turbines of SPIC Yunnan International Fuyuan West Wind Power Project were all connected to the grid, marking that the 800MW plateau wind power base with the largest installed capacity in China was put into full operation.Asian Metal CopyrightOn May 8, the 135 wind turbines of SPIC Yunnan International Fuyuan West Wind Power Project were all connected to the grid, marking that the 800MW plateau wind power base with the largest installed capacity in China was put into full operation.Asian Metal Copyright The Fuyuan West Wind Power Project invested and constructed by SPIC Yunnan International, with a total installed capacity of 800MW and 135 wind turbines installed, is located in Fuyuan County, Zhanyi District and Qilin District of Qujing City.
.Asian Metal Copyright The Fuyuan West Wind Power Project invested and constructed by SPIC Yunnan International, with a total installed capacity of 800MW and 135 wind turbines installed, is located in Fuyuan County, Zhanyi District and Qilin District of Qujing CityAsian Metal Copyright
Neodymium Oxide 99.5%min FOB China
Unit:USD/mt
China praseodymium-neodymium oxide recycling producers' inventory statistics by province by month
Unit: mt