• Cobalt Tetroxide 73.5%min Delivered Chinadown(-5)  05-23|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinadown(-0.2)  05-23|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered South Koreadown(-0.2)  05-23|Rebar HRB400 20mm FOB Chinaup(10)  05-23|Silicon Metal 4-4-1 Delivered Chinadown(-200)  05-23|Wire Rod Q195 6.5mm FOB Chinaup(10)  05-23|Wire Rod SAE1008 6.5mm FOB Chinaup(10)  05-23|Rebar HRB400 12mm FOB Chinaup(10)  05-23|Ferro-molybdenum 60%min Delivered Indiaup(50)  05-23|Ferro-molybdenum 60%min In warehouse Russiaup(50)  05-23|Ferro-silicon 75%min Ex-VAT FOB Chinadown(-20)  05-23|Thermal Coal Q5000 In port Qinhuangdaodown(-10)  05-23|Ferro-silicon 75%min FOB Chinadown(-20)  05-23|Silicon Metal 4-4-1 Ex-VAT FOB Chinadown(-20)  05-23
  • Shuangliang Eco-energy's 50GW monocrystalline silicon project starts construction in Baotou

    2023-03-21 13:31:39   [Print]
    Shuangliang Eco-energy held a commencing ceremony for its third phase of a monocrystalline silicon project in Baotou, Inner Mongolia on March 18.

    The project's third phase, with a total investment of RMB10.5 billion (USD1.Asian Metal CopyrightShuangliang Eco-energy held a commencing ceremony for its third phase of a monocrystalline silicon project in Baotou, Inner Mongolia on March 18.Asian Metal Copyright53 billion), will cover an area of 823mu and achieve an annual production capacity of 50 gigawatts of large monocrystalline silicon materials upon completion.Asian Metal Copyright What's more, the construction of the project will contribute to the formation of an industrial chain layout composed of 100-gigawatt monocrystalline silicon materials, 80-gigawatt new supporting materials and 20-gigawatt photovoltaic modules.Asian Metal Copyright Its annual output value is estimated to be about RMB26.Asian Metal Copyright79 billion.Asian Metal Copyright08 billion (USD3.Asian Metal Copyright The project's third phase, with a total investment of RMB10.Asian Metal Copyright79 billion).

    What's more, the construction of the project will contribute to the formation of an industrial chain layout composed of 100-gigawatt monocrystalline silicon materials, 80-gigawatt new supporting materials and 20-gigawatt photovoltaic modules.
    .Asian Metal CopyrightShuangliang Eco-energy held a commencing ceremony for its third phase of a monocrystalline silicon project in Baotou, Inner Mongolia on March 18Asian Metal Copyright
    Silicon Metal 4-4-1 Delivered Europe
    Unit:EUR/mt
    Silicon Metal 4-4-1 Delivered Europe EUR/mt
    China silicon metal producers' number MoM output increase statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.