• Spodumene Li2O 3%min In port Chinaup(25)  08-08|Terbium Oxide 99.99%min In Warehouse Rotterdamup(100)  08-08|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  08-08|Spodumene Li2O 5%min In port Chinaup(30)  08-08|Lithium Manganate Mn 58% Delivered Chinaup(800)  08-08|Rhenium APR 99.99%min EXW Chinaup(300)  08-08|Lithium Carbonate 99.2%min Delivered Chinaup(2000)  08-08|Lithium Metal 99%min Delivered Chinaup(15000)  08-08|Selenium Powder 99.9%min Delivered Chinaup(5)  08-08|Lithium Carbonate 99.5%min Delivered Chinaup(2000)  08-08|Yttrium Oxide 99.999%min In warehouse Rotterdamup(1.5)  08-08|Yttrium Oxide 99.999%min FOB Chinaup(0.3)  08-08|Ferro-tungsten 75%min FOB Chinaup(1.5)  08-08|Spodumene Li2O 6%min CIF Chinaup(20)  08-08
  • First GW-level offshore wind power project in Greater Bay Area commences construction

    2023-03-20 16:48:03   [Print]
    Recently, CGN Huizhou No.Asian Metal Copyright 2 Port project goes into operation, CGN will have a total of 1GW at the Huizhou Port base, which will be the first GW-level offshore wind power project in the Greater Bay Area.Asian Metal Copyright 2 Port 750MW offshore wind power project started pile sinking, indicating that main offshore part of the first offshore wind power project in the Guangdong-Hong Kong-Macao Greater Bay Area (the Greater Bay Area) commenced construction.Asian Metal Copyright CGN has existing offshore wind power capacity of 250MW at the nearby sea, and when the Huizhou No.Asian Metal Copyright CGN has existing offshore wind power capacity of 250MW at the nearby sea, and when the Huizhou No.Asian Metal Copyright 2 Port project goes into operation, CGN will have a total of 1GW at the Huizhou Port base, which will be the first GW-level offshore wind power project in the Greater Bay Area.Asian Metal Copyright 2 Port project goes into operation, CGN will have a total of 1GW at the Huizhou Port base, which will be the first GW-level offshore wind power project in the Greater Bay Area.

    .Asian Metal Copyright 2 Port 750MW offshore wind power project started pile sinking, indicating that main offshore part of the first offshore wind power project in the Guangdong-Hong Kong-Macao Greater Bay Area the Greater Bay Area commenced constructionAsian Metal Copyright
    NdFeB Sintered Rough N35 EXW China
    Unit:RMB/kg
    NdFeB Sintered Rough N35 EXW China RMB/kg
    China praseodymium-neodymium oxide recycling producers' inventory statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.