• Met. Coke A 13%max, S 0.7%max EXW Shanxidown(-50)  05-16|Met. Coke A 13%max, S 0.7%max EXW Hebeidown(-50)  05-16|Met. Coke A 13%max, S 0.7%max EXW Shandongdown(-50)  05-16|Ferro-silicon 75%min In warehouse Pittsburghup(0.03)  05-16|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(1.3)  05-16|Manganese Ore Australian 45%min In Tianjin Portup(1)  05-16|Manganese Ore Gabonese 44%min In Tianjin Portup(1)  05-16|Manganese Ore Brazilian 44%min In Tianjin Portup(1)  05-16|Lithium Carbonate 99.5%min FOB South Americadown(-0.2)  05-16|Tungsten Ore WO3 65%min EXW Chinaup(4000)  05-16|Silicon Metal 98.5%min Delivered USup(0.03)  05-16|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max FOB Chinadown(-0.2)  05-16|Lithium Carbonate 99.5%min CIF Chinadown(-0.2)  05-16|Lithium Carbonate 99.5%min Delivered EUdown(-0.2)  05-16
  • Shandong's installed new energy & renewable energy capacity up by 28.8% YoY in H1 2022

    2022-08-12 11:58:14   [Print]
    Based on the data released by Shandong Provincial Bureau of Statistic, in the first half of 2022, the installed new energy and renewable energy capacity in Shandong totaled 66.Asian Metal Copyright15GW, 19.Asian Metal Copyright37GW, a year-on-year increase of 28.Asian Metal Copyright3% of the total installed capacity, 5.Asian Metal Copyright8%, accounting of 37.Asian Metal Copyright77GW, 4.Asian Metal Copyright3% of the total installed capacity, 5.Asian Metal Copyright15GW, 19.Asian Metal Copyright6 percentage points higher than the comparative prior period.

    In detail, the installed capacity of solar power generation, wind power generation, biomass power generation and hydroelectric power generation was 37.15GW, 19.Asian Metal Copyright3% respectively.Asian Metal Copyright77GW, 4.Asian Metal Copyright5%, 8.Asian Metal Copyright10GW and 2.Asian Metal Copyright3% respectively.Asian Metal Copyright28GW respectively, up by 42.Asian Metal CopyrightBased on the data released by Shandong Provincial Bureau of Statistic, in the first half of 2022, the installed new energy and renewable energy capacity in Shandong totaled 66.Asian Metal Copyright5%, 8.Asian Metal Copyright77GW, 4.Asian Metal Copyright7%, 10.Asian Metal Copyright6 percentage points higher than the comparative prior period.Asian Metal Copyright7% and 111.Asian Metal Copyright3% of the total installed capacity, 5.Asian Metal Copyright3% respectively.
    .Asian Metal CopyrightBased on the data released by Shandong Provincial Bureau of Statistic, in the first half of 2022, the installed new energy and renewable energy capacity in Shandong totaled 66Asian Metal Copyright
    Silicon Metal 5-5-3 In port India
    Unit:INR/kg
    Silicon Metal 5-5-3 In port India INR/kg
    China silicon metal producers' operating rate statistics by province by month
    Unit: %
      Copyright © Asian Metal Ltd All rights reserved.