• Lead Conc. TC 50%min CIF Chinadown(-10)  08-27|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(15)  08-27|Tungsten Ore WO3 55%min EXW Chinaup(7000)  08-27|Tungsten Ore WO3 65%min EXW Chinaup(7000)  08-27|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(15)  08-27|Zirconium Silicate Zr(Hf)O2 60%min EXW Chinaup(300)  08-27|Cerium Oxide 99.99%min EXW Chinadown(-800)  08-27|Tungsten Bar W-4 99.9%min EXW Chinaup(15)  08-27|Yttrium Oxide 99.999%min In warehouse Rotterdamup(2)  08-27|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(10)  08-27|Tungsten Scrap Drills 70%min Ex-VAT Delivered Chinaup(10)  08-27|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinaup(10)  08-27|Lanthanum Metal 99%min EXW Chinadown(-500)  08-27|Tungsten APT 88.5%min EXW Chinaup(8000)  08-27
  • JA Solar's Phase III project with annual output of 10GW high-efficiency cell and 5GW high-efficiency module starts construction

    2022-07-06 16:46:24   [Print]
    On July 5, Qujing City held the groundbreaking ceremony of the JA Solar's Phase III project with an annual output of 10GW high-efficiency cell and 5GW high-efficiency module.

    Since JA Solar settled in Qujing, it invested RMB6.4 billion (USD952 million) to build the Phase I project with an annual output of 3GW monocrystalline silicon rod and chip, and the Phase II project with an annual output of 20GW monocrystalline silicon rod and chip.Asian Metal CopyrightOn July 5, Qujing City held the groundbreaking ceremony of the JA Solar's Phase III project with an annual output of 10GW high-efficiency cell and 5GW high-efficiency module.Asian Metal Copyright The projects achieved an output value of about RMB2.Asian Metal Copyright19 billion USD922 million, and can achieve an annual output value of RMB16 billion USD2.Asian Metal Copyright66 billion (USD396 million) in 2021, and after reaching the designed capacity, they can realize annual output value of over RMB18.Asian Metal Copyright The Phase III project with an annual output of 10GW high-efficiency cell and 5GW high-efficiency module has a total investment of about RMB6.Asian Metal Copyright9 billion (USD2.Asian Metal CopyrightOn July 5, Qujing City held the groundbreaking ceremony of the JA Solar's Phase III project with an annual output of 10GW high-efficiency cell and 5GW high-efficiency module.Asian Metal Copyright81 billion).Asian Metal Copyright The projects achieved an output value of about RMB2.Asian Metal Copyright The Phase III project with an annual output of 10GW high-efficiency cell and 5GW high-efficiency module has a total investment of about RMB6.Asian Metal Copyright19 billion USD922 million, and can achieve an annual output value of RMB16 billion USD2.Asian Metal Copyright19 billion (USD922 million), and can achieve an annual output value of RMB16 billion (USD2.Asian Metal Copyright9 billion USD2.Asian Metal Copyright38 billion) after reaching the designed capacity.
    .Asian Metal Copyright38 billion after reaching the designed capacityAsian Metal Copyright
    Silicon Metal 4-2-1 Delivered China
    Unit:RMB/mt
    Silicon Metal 4-2-1 Delivered China RMB/mt
    China silicon metal producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.