• Lead Conc. TC 50%min CIF Chinadown(-10)  08-27|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(15)  08-27|Tungsten Ore WO3 55%min EXW Chinaup(7000)  08-27|Tungsten Ore WO3 65%min EXW Chinaup(7000)  08-27|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(15)  08-27|Zirconium Silicate Zr(Hf)O2 60%min EXW Chinaup(300)  08-27|Cerium Oxide 99.99%min EXW Chinadown(-800)  08-27|Tungsten Bar W-4 99.9%min EXW Chinaup(15)  08-27|Yttrium Oxide 99.999%min In warehouse Rotterdamup(2)  08-27|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(10)  08-27|Tungsten Scrap Drills 70%min Ex-VAT Delivered Chinaup(10)  08-27|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinaup(10)  08-27|Lanthanum Metal 99%min EXW Chinadown(-500)  08-27|Tungsten APT 88.5%min EXW Chinaup(8000)  08-27
  • Shuangliang Eco-Energy's Phase I of 40GW monocrystalline silicon project reaches full capacity

    2022-07-04 17:58:12   [Print]
    On July 1, Shuangliang Eco-Energy announced that its first phase of a 40GW monocrystalline silicon project already achieved full production capacity of 20GW.Asian Metal CopyrightOn July 1, Shuangliang Eco-Energy announced that its first phase of a 40GW monocrystalline silicon project already achieved full production capacity of 20GW.Asian Metal Copyright The third monocrystalline plant is under construction now and predicted to reach design capacity of 40GW by the end of October 2022.
    .Asian Metal Copyright The third monocrystalline plant is under construction now and predicted to reach design capacity of 40GW by the end of October 2022Asian Metal Copyright
    Silicon Metal 4-2-1 Delivered China
    Unit:RMB/mt
    Silicon Metal 4-2-1 Delivered China RMB/mt
    China silicon metal producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.