• Lead Conc. TC 50%min CIF Chinadown(-10)  08-27|Tungsten Carbide 99.8%min 2.5-7.0μm EXW Chinaup(15)  08-27|Tungsten Ore WO3 55%min EXW Chinaup(7000)  08-27|Tungsten Ore WO3 65%min EXW Chinaup(7000)  08-27|Tungsten Powder 99.95%min 2.5-7.0μm EXW Chinaup(15)  08-27|Zirconium Silicate Zr(Hf)O2 60%min EXW Chinaup(300)  08-27|Cerium Oxide 99.99%min EXW Chinadown(-800)  08-27|Tungsten Bar W-4 99.9%min EXW Chinaup(15)  08-27|Yttrium Oxide 99.999%min In warehouse Rotterdamup(2)  08-27|Tungsten Scrap CNC Cutting Blades 70%min Ex-VAT Delivered Chinaup(10)  08-27|Tungsten Scrap Drills 70%min Ex-VAT Delivered Chinaup(10)  08-27|Tungsten Scrap Anvil 90%min Ex-VAT Delivered Chinaup(10)  08-27|Lanthanum Metal 99%min EXW Chinadown(-500)  08-27|Tungsten APT 88.5%min EXW Chinaup(8000)  08-27
  • Beijing: Renewable energy installed capacity reaches 4.35 million kilowatts by 2025

    2022-07-01 15:25:00   [Print]
    On June 29, the Beijing Municipal Commission of Urban Management publicly released the "Beijing Electric Power Development Plan during the 14th Five-Year Plan", which stated that by 2025, the installed capacity of renewable energy will reach 4.Asian Metal CopyrightOn June 29, the Beijing Municipal Commission of Urban Management publicly released the "Beijing Electric Power Development Plan during the 14th Five-Year Plan", which stated that by 2025, the installed capacity of renewable energy will reach 4.Asian Metal Copyright35 million kilowatts.Asian Metal CopyrightOn June 29, the Beijing Municipal Commission of Urban Management publicly released the "Beijing Electric Power Development Plan during the 14th Five-Year Plan", which stated that by 2025, the installed capacity of renewable energy will reach 4.Asian Metal Copyright In particular, the installed scale of photovoltaic power generation will reach about 2.Asian Metal CopyrightOn June 29, the Beijing Municipal Commission of Urban Management publicly released the "Beijing Electric Power Development Plan during the 14th Five-Year Plan", which stated that by 2025, the installed capacity of renewable energy will reach 4.Asian Metal Copyright51 million kilowatts, that of biomass power generation will reach about 550,000 kilowatts, and that of wind power generation will reach about 300,000 kilowatts.
    .Asian Metal Copyright51 million kilowatts, that of biomass power generation will reach about 550,000 kilowatts, and that of wind power generation will reach about 300,000 kilowattsAsian Metal Copyright
    NdFeB Sintered Rough 45M EXW China
    Unit:RMB/kg
    NdFeB Sintered Rough 45M EXW China RMB/kg
    China's praseodymium-neodymium mischmetal producers' sales volume statistics by province by month
    Unit: mt
      Copyright © Asian Metal Ltd All rights reserved.