• Praseodymium Oxide 99.5%min FOB Chinaup(2300)  08-15|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(16000)  08-15|Spodumene Li2O 5%min In port Chinaup(35)  08-15|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.5)  08-15|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(15)  08-15|Spodumene Li2O 6%min CIF Chinaup(25)  08-15|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(18000)  08-15|PrNd Mischmetal Pr 25%, Nd 75% FOB Chinaup(2.5)  08-15|Neodymium Oxide 99.5%min EXW Chinaup(15000)  08-15|Spodumene Li2O 3%min In port Chinaup(25)  08-15|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-15|Ferro-silicon 75%min, Ti 0.03%max Delivered Chinaup(200)  08-15|Rhenium APR 99.99%min EXW Chinaup(300)  08-15|Neodymium Oxide 99.5%min FOB Chinaup(2000)  08-15
  • Angang Group's Zhoukou capacity replacement project Phase I ignites blast furnace

    2021-05-19 10:55:37   [Print]
    On May 18, with the successful ignition of No.Asian Metal Copyright 1 blast furnace in the first phase of Angang Group's Zhoukou capacity replacement project, the project entered the full production stage, starting a new chapter in the layout optimization and transformation and upgrading of the iron and steel industry in Henan.Asian Metal Copyright 1 blast furnace in the first phase of Angang Group's Zhoukou capacity replacement project, the project entered the full production stage, starting a new chapter in the layout optimization and transformation and upgrading of the iron and steel industry in Henan.
    .Asian Metal CopyrightOn May 18, with the successful ignition of NoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.