• Praseodymium Oxide 99.5%min FOB Chinaup(2300)  08-15|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(16000)  08-15|Spodumene Li2O 5%min In port Chinaup(35)  08-15|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.5)  08-15|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(15)  08-15|Spodumene Li2O 6%min CIF Chinaup(25)  08-15|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(18000)  08-15|PrNd Mischmetal Pr 25%, Nd 75% FOB Chinaup(2.5)  08-15|Neodymium Oxide 99.5%min EXW Chinaup(15000)  08-15|Spodumene Li2O 3%min In port Chinaup(25)  08-15|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-15|Ferro-silicon 75%min, Ti 0.03%max Delivered Chinaup(200)  08-15|Rhenium APR 99.99%min EXW Chinaup(300)  08-15|Neodymium Oxide 99.5%min FOB Chinaup(2000)  08-15
  • Angang Group Zhoukou Iron and Steel's blast furnace ignited

    2021-05-18 17:49:31   [Print]
    According to reports, on the morning of May 18, 2021, the blast furnace of Zhoukou Iron and Steel of Anyang Iron & Steel Group (Angang Group) was successfully ignited.

    The construction project of Angang Group Zhoukou Iron and Steel Base is a key project in Henan to promote supply-side reform and realize the optimization and adjustment of the iron and steel industry in the province. At the same time, it is also the first large-scale modern steel company to settle in Zhoukou.Asian Metal Copyright The project is located in the Iron and Steel Industrial Park of Shenqiu, Zhoukou, and plans to build a 1,860-cubic-meter blast furnace and supporting systems in the first phase.Asian Metal Copyright The project is located in the Iron and Steel Industrial Park of Shenqiu, Zhoukou, and plans to build a 1,860-cubic-meter blast furnace and supporting systems in the first phase.Asian Metal CopyrightAccording to reports, on the morning of May 18, 2021, the blast furnace of Zhoukou Iron and Steel of Anyang Iron Steel Group Angang Group was successfully ignited.Asian Metal Copyright After all construction is completed, the planned production capacity of steel may reach 10 million tons.

    .Asian Metal Copyright The project is located in the Iron and Steel Industrial Park of Shenqiu, Zhoukou, and plans to build a 1,860-cubic-meter blast furnace and supporting systems in the first phaseAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.