• Praseodymium Oxide 99.5%min FOB Chinaup(2300)  08-15|PrNd Oxide Pr6O11 25%, Nd2O3 75% EXW Chinaup(16000)  08-15|Spodumene Li2O 5%min In port Chinaup(35)  08-15|Antimony Trioxide 99.5%min In warehouse Rotterdamdown(-1.5)  08-15|Thorium Tungsten Electrode ThO2 1.7-2.2% EXW Chinaup(15)  08-15|Spodumene Li2O 6%min CIF Chinaup(25)  08-15|PrNd Mischmetal Pr 25%, Nd 75% EXW Chinaup(18000)  08-15|PrNd Mischmetal Pr 25%, Nd 75% FOB Chinaup(2.5)  08-15|Neodymium Oxide 99.5%min EXW Chinaup(15000)  08-15|Spodumene Li2O 3%min In port Chinaup(25)  08-15|Lithium Hydroxide LiOH 56.5%min, Magnets 0.0001%max Delivered Chinaup(2000)  08-15|Ferro-silicon 75%min, Ti 0.03%max Delivered Chinaup(200)  08-15|Rhenium APR 99.99%min EXW Chinaup(300)  08-15|Neodymium Oxide 99.5%min FOB Chinaup(2000)  08-15
  • Rizhao plans to build iron and steel production and smelting park with capacity of 40 million tons

    2021-05-06 15:16:13   [Print]
    Recently, the Bureau of Industry and Information Technology of Rizhao secondly issued the environmental impact assessment for the plan of building production and smelting park of an advanced iron and steel manufacturing base in Rizhao and wanted to seek public opinions.Asian Metal CopyrightRecently, the Bureau of Industry and Information Technology of Rizhao secondly issued the environmental impact assessment for the plan of building production and smelting park of an advanced iron and steel manufacturing base in Rizhao and wanted to seek public opinions.Asian Metal Copyright Rizhao made this plan in 2019 and expected the construction period would start in 2020 and end in 2025.Asian Metal Copyright Rizhao made this plan in 2019 and expected the construction period would start in 2020 and end in 2025.Asian Metal Copyright In the short-term period of 2020-2022, the capacity of this park would reach 31.Asian Metal Copyright Rizhao made this plan in 2019 and expected the construction period would start in 2020 and end in 2025.Asian Metal Copyright10 million tons.Asian Metal Copyright10 million tons.Asian Metal Copyright The capacity would move up to 40 million tons in the long-term period from 2023-2025.
    .Asian Metal Copyright Rizhao made this plan in 2019 and expected the construction period would start in 2020 and end in 2025Asian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.