• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Ligeance Mineral Chengdu Aerospace has not put rhenium into massive production now

    2017-09-05 17:58:27   [Print]
    On September 4, opening price of Ligeance Mineral stocks reached the highest transaction price of the day, which benefited from the realization of rhenium purification led by wholly-owned subsidiary, Chengdu Aerospace Superalloy Technology Co.Asian Metal Copyright Public statistics show that Chengdu Aerospace was established in July 2013 with registered assets of RMB200 million and mainly undertakes the project of high-temperature rhenium alloy blade of aero-engine, the key project that Ligeance Mineral spends huge fund.Asian Metal Copyright, Ltd.Asian Metal Copyright Security department of Ligeance Mineral Resources Co.Asian Metal Copyright (hereinafter referred to as “Chengdu Aerospace”) with breakthrough of foreign technology block.Asian Metal Copyright Owing to lacking orders, Chengdu Aerospace has not produced rhenium massively at the moment and downstream single crystal blade is in technical certification phase without large scale production.Asian Metal Copyright Owing to lacking orders, Chengdu Aerospace has not produced rhenium massively at the moment and downstream single crystal blade is in technical certification phase without large scale production.

    Although the company realized technical breakthrough in purification of rhenium, they have not put the material into massive production now. Security department of Ligeance Mineral Resources Co.Asian Metal Copyright, Ltd.Asian Metal Copyright, Ltd.Asian Metal Copyright Owing to lacking orders, Chengdu Aerospace has not produced rhenium massively at the moment and downstream single crystal blade is in technical certification phase without large scale production.Asian Metal Copyright disclosed that although rhenium supply falls short of demand, Chengdu Aerospace has not received market orders and cannot produce with large quantity as its downstream clients are military enterprises who are strict about technology.Asian Metal Copyright hereinafter referred to as “Chengdu Aerospace” with breakthrough of foreign technology block.Asian Metal Copyright The source also claimed that as Chengdu Aerospace is in technical certificate phase for the moment, they cannot make mass production despite that the company has completed installment of the second single crystal blade furnace.

    Public statistics show that Chengdu Aerospace was established in July 2013 with registered assets of RMB200 million and mainly undertakes the project of high-temperature rhenium alloy blade of aero-engine, the key project that Ligeance Mineral spends huge fund. In 2014, Ligeance Mineral finished the non-public issues of stocks and used RMB600 million of the funds raised in the project.Asian Metal Copyright, Ltd.Asian Metal Copyright Chengdu Aerospace cumulatively invested RMB369 million in it at the end of 2016.
    .Asian Metal CopyrightOn September 4, opening price of Ligeance Mineral stocks reached the highest transaction price of the day, which benefited from the realization of rhenium purification led by wholly-owned subsidiary, Chengdu Aerospace Superalloy Technology CoAsian Metal Copyright
      Copyright © Asian Metal Ltd All rights reserved.