• Antimony Trioxide 99.5%min In warehouse Baltimoreup(0.8)  05-09|Silicon Metal 5-5-3 Delivered Europedown(-50)  05-09|Spodumene Li2O 6%min CIF Chinadown(-20)  05-09|Manganese Ore Australian 45%min In Tianjin Portdown(-1)  05-09|Spodumene Li2O 3%min In port Chinadown(-20)  05-09|Silicon Metal 4-4-1 Delivered Europedown(-50)  05-09|Antimony Ingot 99.65%min In warehouse Rotterdamup(1500)  05-09|Terbium Metal 99.9%min FOB Chinaup(30)  05-09|Dysprosium Oxide 99.5%min EXW Chinaup(40)  05-09|Manganese Ore Brazilian 44%min In Qinzhou Portdown(-1)  05-09|Ferro-titanium 70%min Delivered USdown(-0.2)  05-09|Manganese Ore 38%min FOB S.A. up(0.07)  05-09|Terbium Metal 99.9%min EXW Chinaup(200)  05-09|Stainless Bar 304 60mm In warehouse Dainandown(-300)  05-09
  • Camel Group to set up a joint venture on waste battery recycling

    2017-06-30 17:35:58   [Print]
    On June 28, Camel Group (601311) announced that it has signed a cooperation agreement with Jia Lei on setting up a joint venture Camel Group Anhui Recycled Resources Co.Asian Metal Copyright Anhui is the biggest province in China in terms of secondary lead production and has an important position in the industry.Asian Metal Copyright, Ltd.Asian Metal Copyright, which will mainly focus upon recycling of waste battery.Asian Metal Copyright, which will mainly focus upon recycling of waste battery.Asian Metal Copyright The new company will have a total registration capital of RMB50 million, to which Camel Group will contribute RMB35 million and Jia Lei RMB15 million.Asian Metal Copyright The new company will have a total registration capital of RMB50 million, to which Camel Group will contribute RMB35 million and Jia Lei RMB15 million.

    Anhui is the biggest province in China in terms of secondary lead production and has an important position in the industry. To be built in Taihe county, Anhui, the joint venture will enjoy favorable geographical advantages of the county as well as supporting policies by local government, enabling it to grasp latest industrial developments and market information.Asian Metal Copyright, Ltd.Asian Metal Copyright The both sides will work hard together, striving to put the new company into operation within 14 months after the agreement signed.Asian Metal Copyright The both sides will work hard together, striving to put the new company into operation within 14 months after the agreement signed.Asian Metal Copyright The new company is expected to have an annual capacity of 260,000t of refined lead.

    .Asian Metal Copyright The new company will have a total registration capital of RMB50 million, to which Camel Group will contribute RMB35 million and Jia Lei RMB15 millionAsian Metal Copyright
    Lead Ingot Secondary 98%min EXW China
    Unit:RMB/mt
    Lead Ingot Secondary 98%min EXW China RMB/mt
    China primary lead producers' suspension number statistics by province by month
    Unit: pcs
      Copyright © Asian Metal Ltd All rights reserved.