• Tin Conc. Burmese 20%min IW MengAup(10000)  04-08|Tin Conc. Burmese 30%min IW MengAup(10000)  04-08|Tungsten Carbide 99.8%min 2.5-7.0μm FOB Chinaup(10)  04-08|Tin Conc. 60%min Delivered Chinaup(10000)  04-08|Tungsten Bar W-4 99.9%min FOB Chinaup(10)  04-08|Tungsten Ore WO3 50%min FOB Africaup(50)  04-08|Tin Ingot 99.95%min EXW Chinaup(10000)  04-08|Tungsten APT 88.5%min IW Rotterdamup(70)  04-08|Tin Solder Wire 99.3%min EXW Chinaup(10)  04-08|Rebar CB400V/SD390 Φ14-32mm IW Hanoiup(400000)  04-08|LaCe Chloride TREO 45%min, CeO2/REO 65±2% EXW Chinaup(40)  04-08|LaCe Carbonate TREO 45%min, CeO2/REO 65±2% EXW Chinaup(50)  04-08|Ferro-tungsten 75%min IW Rotterdamup(8)  04-08|Nickel Ore Philippine 1.5%min CIF Chinadown(-2)  04-08
  • 
    AsianMetal
    Events & Holidays
    event
    
    Business Visits

    Emirate Mining visits Asian Metal

    On 14th November, 2018, Lanre Afebuameh, President of Emirate Mining & Geominerals Ltd. and Ronald Onosode, Vice President visited Asian Metal and conducted discussions with the International Market Manager Max and the Senior Analyst Maggie about the tantalum and niobium market of Asian Metal.
    Ronald introduced some basic information about their company. They focus on tantalite and columbite business. They have processors in Nigeria which can supply around 200tpm of columbite 25-45% in the spot market. The two sides shared ideas about the tantalum-niobium market and the Sino-US trade war. Emirate Mining speaks highly of the professional services of Asian Metal and looks forward to further cooperation. They also plan to expand Chinese market through the platform of Asian Metal.
    Asian Metal
     
      Copyright © Asian Metal Ltd All rights reserved.